Sunday, August 3, 2008

Underslab Plumbing

Trenching and laying out the underslab drain pipe.


Drain and vent stacks. Main drain is 4" sch40 PVC. These go up to downstairs bath, utility room, or are other vent&drains for second floor plumbing. Lucking we have a really good plumber (Levi) who planned out the entire hosue plumbing system first. Everything has to be exactly configured here. You can't easily change anything after the slab is poured.

Trench and water line leading to the well.

No comments: